Project Description

Planned Preventative Maintenance

The PPM program can consists of various possible levels (examples: 3 Monthly, 6 Monthly, 1 Yearly and 2-4 Yearly), which can be applied to all equipment and are generally conducted along with an inspection. Each task will be detailed per crane type and duty cycle, using a “job card” format, and can be detailed to meet specific Partner needs and requirements. Please see crane inspections, for more details. TOS shall provide our partners with detailed reports on a daily, per inspection, monthly and annual basis.